TUNNELLING MACHINES FRONT CPP "MIR"
Purpose of the development:
Roadheader CPP "MIR" is designed for high-speed automation of horizontal and
inclined workings of breeds section of any strength.
Recommended application field:
Mining industry. Building.
Advantages over analogues:
Advantages:
· Versatility on rock strength (f <20) and the slope of the workings (± 45 °);
· Exclusion of costly and cumbersome motors, shafts, blades, caterpillars;
· Flowing without human excavation, automation, mechatronics, safety and
comfort labor;
· CPP "MIR" is superior to all existing types of tunneling machines, and they can
push on the world markets of mining equipment. For the coal industry of Ukraine
to produce 300-350 units. / Year.
The development stage readiness:
Ready for application
Technical and economic effect:
Efficiency:
· The rate of penetration 2-3 m / s (50-100 m / day), the growth of labor productivity in
7-12 times;
· Reducing the cost of the combine in 2-3 times, and the workings of penetration of 3-5.
Description of the development:
() Relevance.
The underground construction and mining extraction of raw materials necessary to carry out
tens of thousands of miles of mine workings. Existing processors are not able to satisfactorily resolve the
task due to design complexity, high cost, inability to automate, low
ergonomics, and a narrow scope.
Novelty: screw the working body, the new spacer-walking mover, cutting
tool - cone, a new layout design.
Combine the CPP MIR. Coal of Ukraine, 2005, № 7, p.22-24.
Ukraine Patent number 25600.
corresponds technical description
Ready for implementation
Possibility of transfer abroad:
Licence's sale Licence's sale
Photo
Country
Ukraine
For additional information turn to: E-mail: gal@uintei.kiev.ua
|