Purpose of the development:
The installation is intended for production of leaden shot with productivity of 250 kg per hour.
The development stage readiness:
Introduced in production
Description of the development: () It is attained by induction melting of lead or leaden alloys, electromagnetic disintegration of melted metal jet, formation of spherical unisized particles and their crystallization. Because of simplified technological process as compared to known production-line methods, the power consumption is reduced, the strong shot is obtained using the cheaper lead
salvage, the conditions of work become more healthy.
Possibility of transfer abroad:
Licence's sale Realization of finished commodity