Declared technologies base

TRANSFER OF INNOVATIONAL TECHNOLOGIES

TREATMENT FACILITIES OF DOMESTIC WASTEWATER (MODULE "RODNICK")


Purpose of the development: Module "Spring" is for the full biological treatment of domestic (municipal) and close to the composition of industrial waste water, with reduced concentrations of BOD, suspended solids, grease, petroleum products and other pollutants to the limit values

Recommended application field: Wastewater treatment systems can be used in various industries, in both the industrial and public utilities

Technical characteristic: Specifications: Modules "Spring" 12 25 50 100 200 400 500 600 800 1000 1500 2000 2500 - Produces, cubic m. / Day 12 25 50 100 200 400 500 600 800 1000 1500 2000 2500; - Operating pressure output blowers kPa 30 30 40 40 40 40 40 40 40 40 40 40 40; - The total installation motor power kW, maximum 3.5 3.5 5.3 5.3 8.8 10.3 15.6 23.1 35.0 81.5 96.5 130.5 134.5; - The mass, m is not a Transportation 2.2 3.2 7.2 13.4 21.5 56.8 72.5 84.3 112.4 124.8 180.7 209.2 271.5; Working 10.4 23.84 47.9 10,5,2 203.3 460 623.3 710.7 940.4 1089.6 1615.3 1959 2577.3; - Dimensions biological unit cleaning, mm Length 3670 4380 6600 7400 7700 12216 18324 18324 24864 28372 40702 34080 34080; width 1580 2578 2750 3100 6400 9331 8432 9632 12216 12216 12216 18324 24432; Height 2000 2000 2200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200; - Dimensions block averaging-nitro- denitrification mm Length 3670 4380 6600 7400 7400 12216 18324 18324 12216 12216 12216 18324 24432; width 1580 2578 2750 3100 3100 2308 2308 2508 5216 5616 7524 5616 4616; Height 2000 2000 2200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200.

Advantages over analogues: Designed Series modules and complete a local wastewater treatment could replace bulky and expensive standard treatment facilities. The modules are suitable for hospital transport, fast to install, simple and easy to use.

The development stage readiness: Introduced in production

Description of the development:
()
In the module "Spring" used a two-stage biological treatment, the second stage is fixed biocenosis that solves a serious issue sludge removal and ensures the stability of the cleaning process, including smoothes out daily fluctuations in volume flows and concentrations. By recycling sludge and alternating anaerobic and aerobic processes to reduce the high degree of concentration on ammonia nitrogen (nitrification and denitrification) and phosphorus (by increasing the number of bacteria in need of this element for the construction of cells during their life). No secondary pollution by two-stage sewage sludge from waste landfill. The use of sludge box stabilizer eliminates the technological scheme of additional equipment (for example, the first stage digester) with strict requirements to control the operation. Depending on your area, the direction of the wind rose and the requirements of normokontroliruyuschih as storage of waste sludge may be used as mud maps and the sludge box peregnivateli. Starting with the performance of 400-500 cubic meters. / Day., And depending on weather and other conditions provided for dewatering sludge mineralized belt or chamber filter presses. The cleaning process is formed of highly sediment that can be used as organic fertilizer. The treated water can be discharged into waters of cultural and fishery.

Possibility of transfer abroad:
Licence's sale
Realization of finished commodity

Photo

Country Russia

For additional information turn to:
E-mail: gal@uintei.kiev.ua

or fill out the form:
Organization name :
Address :
Settlement account :
Bank :
MFO :
OKPO code :

Scientific organization tutor's data :
Surname :
Name :
Patronymic :
Scientific degree :
Phone :
Fax :
E-mail :
Cooperation proposals (joint patent, joint enterprise, assembly sale and so on :
country: