Declared technologies base

TRANSFER OF INNOVATIONAL TECHNOLOGIES

ACS PROCESS WASTEWATER IN MINES


Purpose of the development: Assessment of the current technical condition of the constituent parts and wastewater study their individual characteristics. Development of options to improve the energy efficiency of the complex mine water and the choice of options that meet the requirements of the Customer. Monitoring of the technical state of the complex joint. Management of the complex seam using a system that is compatible with the ERP-system of the corporation. Monitoring of the technical state of the complex seam: --- Low efficiency (30-40% lower than the certified value); --- Lack of coordination with the hydraulic network, poor condition of most pumps. Depending on the combination of the pumps at their current technical condition of the specific energy consumption changed several times.

Recommended application field: Mining.

Advantages over analogues: Drainage control system is designed for the process on the principle of minimum energy costs due to: --- Measuring the main energy characteristics and performance of the pumps; --- Evaluating the performance of pumps when they run in parallel on a common collector; --- Groupings pumps for minimal negative feedback loops. Energy efficient algorithm: --- Turning to the work of pumping units with high energy efficiency. Continuous monitoring of the technical state of each pump unit and the construction of priority control table. --- Select the optimal combination of pumping units at their joint work on the common collector. --- Forecast unit cost of electricity for each combination of pumps and selecting the best combinations. --- Automated predpikovoe Pump set. The calculation of the optimal schedule --- Pump set by the minimum cost electricity with the daily rate. Optimal control of the pumping units to reduce the daily energy consumption, provide annual cost savings in wastewater. The resulting annual cost savings of about 1760 UAH. water inflow at 1500 cubic meters / hour. The payback period is less than a few years, depending on working conditions of the seam, the technical condition of pumping units and their effective work.

The development stage readiness: Ready for application

Description of the development:
()
Drainage control system - a source of reliable, accurate, complete and accurate information about the current technical condition of the constituent parts removal. Structurally, a drainage control system control module, which can be expanded up to DSS management of a complex mine water to effectively address the problems of control process wastewater and human resources, material resources, repair and other works of the complex. DSS management of a complex mine water runs compatible with ERP-systems corporations and technically necessary for the successful functioning ERP-system.

corresponds technical description
Ready for implementation

Possibility of transfer abroad:
Licence's sale
Licence's sale
Technological document's sale
Combinated reduction to industrial level
Creation of joint enterprise

Photo

Country Ukraine

For additional information turn to:
E-mail: gal@uintei.kiev.ua

or fill out the form:
Organization name :
Address :
Settlement account :
Bank :
MFO :
OKPO code :

Scientific organization tutor's data :
Surname :
Name :
Patronymic :
Scientific degree :
Phone :
Fax :
E-mail :
Cooperation proposals (joint patent, joint enterprise, assembly sale and so on :
country: