VISUAL SURVEY OF THE RIVER KISVA IN RAKHIVSKY DISTRICT FROM THE TRIBUTARY YAVIRSKY TO THE TRIBUTARY DOVGY POTIK IN TERMS OF EXPE DIENCE OF SMALL HYDROELECTRIC P
Purpose of the development:
Expert assessment of small hydroelectric power stations installation on selected areas of rivers in the Carpathian region of Ukraine, as well as in other regions with similar climatic conditions. Consulting services are provided.
Recommended application field:
Hydro power engineering.
Technical characteristic:
When choosing the type of hydroelectric power station, capabilities of derivative, channel and dam staions has been considered.
The development stage readiness:
Ready for application
Technical and economic effect:
Expert assessment of small hydroelectric power stations installation is based on original methodology for determining profitability and payback period of them; developed method is that it is designed based on real information about small already built hydroelectric power stations.
Description of the development:
() Expert assessment of small hydroelectric power stations installation expenditure is based on the analysis of existing information on hydrological, topographical, geological and other characteristics of selected areas of rivers and visual survey sites under consideration. These parameters are roug hly defined as well as, technical and economic indices of hydroelectric power stations different placement options and their types. The problem of pla cing hydroelectric power stations is viewed in complex, taking into account issues of producing power, flooding control of lands, fisheries, recreatio n and other conditions.
corresponds technical description
Ready for implementation
Possibility of transfer abroad:
Combinated reduction to industrial level
Photo
Country
Ukraine
For additional information turn to: E-mail: gal@uintei.kiev.ua
|