WASTE RECYCLING ENERGY COMPLEX
Purpose of the development:
Ukrainian developers propose to introduce an effective waste processing complex project, providing full cycle of recycling of household waste.
Recommended application field:
Municipalities, waste processing company, the production of high-calorie waste.
Advantages over analogues:
- reliability - TBO complete equipment 25,000 hours;
- cogeneration complex makes it possible to obtain not only the hot water, but also a large number of dry hot air;
- half the price for capital per unit of energy output compared to classic cogeneration systems.
The development stage readiness:
Ready for application
Description of the development:
() Facilities of the complex will occupy an area of 1-2 hectares and can process up to 500 tons of garbage per day. Due to high efficiency (up to 70%), the plant will generate up to 2.5 megawatts of electricity per month and up to 7MVt thermal energy capacity of recycling will be up to 15,000 tons / month.
The complex is based on a gas turbine elektrostrantsii, which has already been successfully finalized. sorting line and feed preparation unit are designed based on the type of raw material and fuel that is used. The complex has an integrated closed loop: 1) recycling of waste - receiving low-calorie fuel; 2) the use for the resulting fuel-air turbine drive; 3) the use of hot water for district heating supply networks; 4) the use of the exhaust gas and the gas generator for heating water.
To create and run a waste recycling energy sector requires investments of $ 6-10 million USD depending on capacity and raw material type, duration of implementation -. Up to 1 year, the payback period of approximately 3 years (for the conditions of Ukraine).
corresponds technical description
Ready for implementation
Possibility of transfer abroad:
Combinated reduction to industrial level
Photo
Country
Ukraine
For additional information turn to: E-mail: gal@uintei.kiev.ua
|