MOUNT ARCHED FRAMEWORK REINFORCED BY CAP
Purpose of the development:
The clamps are designed to bond the primary and preparatory mining in complex geological conditions.
Recommended application field:
In the mining industry.
Advantages over analogues:
Mounting of CAP provides increased load-carrying capacity 1.5-1.8 times, lower costs scarce rolled steel 1.5-1.7 times, increasing the stability of production in 1,5-1,7 times.
The development stage readiness:
Ready for application
Technical and economic effect:
At 1 km of excavation only by saving rolled steel is 200-250 thousand UAH.
Description of the development:
() Implemented management efforts in the fixture in accordance with the terms of the download by setting a reinforcing element for cert and its prestressing.
When installing the attachment mounted reinforcing element of length on verhnyake special profile and create pre-tension mounting his moments.
Novelty: is to manage the state of stress most loaded moments arch mounting section (cinch) by installing a gain element with special profile and its prestressing unload moments.
Possibility of transfer abroad:
Combinated reduction to industrial level
Photo
Country
Ukraine
For additional information turn to: E-mail: gal@uintei.kiev.ua
|